Many people have questions about the status of the dock. This update may answer some of them. When we started re-wrapping the dock pilings in September, we discovered large holes in several pilings. The holes are the work of worms and they have compromised the structural integrity of the dock. As many as 10 pilings have to be replaced.

The Board has hired a structural engineer to analyze the entire dock and to draw plans for the necessary repairs. That work is underway. As part of the repair project, we plan to install a new hoist system. The existing hoist is contributing to part of the problem as it has placed considerable stress on some of the pilings. We will have a proposal for the new hoist system soon.

The dock repair and the new hoist system is a major project that will tax the club’s monetary resources. That is why the club recently sent you a letter soliciting your tax deductible contributions to the Building Fund to help pay for the repair costs.

We have been in contact with BCDC as that agency will have to approve the repairs. We don’t anticipate any approval problems, but can’t apply for a permit
until we have a set of plans for the pier repairs and the hoist system. When we get the hoist proposal and complete the structural engineering work(probably by early to mid January), we will have a better handle on the total cost and the timetable for completing the work. We will keep you posted as new information is available.

Daniel Taaffe